flashback-swallowhall

Named for George Clinton Swallow (1817-1899), MU’s first professor of geology, chemistry, and agriculture, Swallow Hall was designed in 1892 and constructed in 1893. Swallow was also the first dean of the college of agriculture and the first state geologist of Missouri. The name was retained even after the biology and geology schools relocated buildings. Swallow Hall later housed the school of business and commerce and then housed the anthropology department.

The building’s architect was Morris Frederick Bell, who designed many of the buildings around the Francis Quadrangle. Bell moved to Missouri in 1869 and settled in Fulton in 1871.

Swallow Hall is located at the southeast corner of the Quad. It was named to the Columbia Historic Preservation Commission’s notable properties list in 2002 and is on the National Register of Historic Places as part of MU’s “Red Campus,” named for the red brick used in construction of the buildings found in the quad area.

Tornado damage in 1931 blew a turret off, caved in the roof, and blew out windows in the building. In 2000, MU did exterior repairs, restoring the building to its original architectural standards and restoring the “witch’s hats” on top of the building.

Swallow Hall was the home of the Museum of Anthropology before renovations moved the museum to Mizzou North in 2013. The Museum of Anthropology houses exhibits on Native Americans, Missouri pioneer history, worldwide cultures, and more.

The exterior walls of Swallow Hall were preserved and the inside was renovated. Renovations were completed this summer, and the building reopened in August 2016.

The renovated building houses the departments of anthropology and art history and archaeology, with an additional 8,349 square feet of usable space, including a new 100-seat lecture hall and a new 35-seat classroom, plus improved ADA and Life Safety Code features. During restorations, they replaced wooden structures in the building that allowed for space reconfiguration, including a third floor and improvements to the basement. In 2015, MU estimated the cost of the reconstruction project to be $16.9 million and reported that $5.5 million in facility needs will be eliminated now that the project is completed.

 

Recent News

20 Under 20: Class of 2017

2017 marks the third year of CBT‘s 20 Under 20, a program celebrating 20 outstanding high school seniors in Columbia who have big potential. Every...

Three Compromising Cybersecurity Myths

  Cybercriminals often possess an air of secrecy that makes us assume they’re smarter than they are. But hackers aren’t neccesarily geniuses — it’s...

Barbara Ramsey leads an all-male organization

  For over hundreds of years, freemasonry has stood as the world’s oldest and largest fraternity. It’s a renowned brotherhood with a chief mission...

School Board Candidates Explain Vision Ahead of Election

Four candidates are vying for three open spots on the Columbia Public Schools Board of Education. Ahead of the election on April 4, CBT caught up...

Bottle Rocket Business Plan: Female Entrepreneurs Born Young

This article appeared in print as part of “Ask & Give: Female Entrepreneurs Rally in Columbia”  Growing up, it didn’t take long for Liz...